Risk mitigation is the work of reducing a risk to a level the organisation is prepared to accept. It lowers how likely an event is, how serious it would be, or both. In AS ISO 31000:2018 it sits inside risk treatment, alongside avoiding a risk, sharing it and knowingly accepting it. Good mitigation is proportionate: the controls match the risk, they are chosen for a reason that can be explained, and someone is accountable for the risk that remains.

  • Mitigation changes the likelihood of a risk, its consequences, or both.
  • Choose controls from the risk assessment, not from a product catalogue.
  • Layer controls so one failure does not leave the risk unmanaged.
  • Write down the residual risk, and have someone with authority accept it.
The options

What are the risk mitigation strategies?

AS ISO 31000:2018 sets out the options for treating a risk: avoiding it, taking or increasing it to pursue an opportunity, removing its source, changing its likelihood, changing its consequences, sharing it, and retaining it by an informed decision.1 Mitigation in the everyday sense covers the middle of that list. The table shows the options that apply to most security and resilience risks.

Option What it means Security example
Avoid Decide not to start or continue the activity that creates the risk. Not holding cash on site overnight.
Remove the source Take away what creates the risk. Removing hazardous materials that are no longer needed.
Change the likelihood Make the event less likely to happen. Access control, lighting, vetting and supervision.
Change the consequences Make the impact smaller if it does happen. Duress alarms, backups, business continuity plans.
Share Move part of the risk to another party. Insurance and contract terms with suppliers.
Retain Accept the risk by an informed decision, within tolerance. Accepting a low risk that would cost more to treat than it could cost.

Options are usually combined. A site that holds valuable stock might reduce the likelihood of theft with access control and lighting, reduce the consequences with insurance and stock limits, and accept a small remaining risk.

Security controls

How security controls work in layers

For security risks, controls work best in layers, so that the failure of one does not leave the risk unmanaged. A common way to think about the layers is:

  • Deter: make the target look hard or unattractive, for example with visible lighting, signage and good maintenance.
  • Detect: know when something is wrong, through alarms, CCTV, staff awareness and reporting.
  • Delay: slow an intruder down long enough for a response, with fences, doors, locks and secure rooms.
  • Respond: make sure someone can act in time, through guards, police, procedures and duress alarms.
  • Recover: get back to normal operations, through business continuity plans, backups and insurance.

Layering also means using different kinds of control together: physical measures, technology, procedures and people. A camera nobody watches, or a lock with an unmanaged key register, mitigates very little.

People risks

Where work health and safety fits

Some security risks are also work health and safety risks, such as aggression towards staff, lone work and occupational violence. For these, Australian WHS duties expect controls to be chosen using the hierarchy of controls: eliminate the risk where possible, then minimise it through substitution, isolation and engineering controls, then administrative controls, and finally personal protective equipment.3 Higher-order controls protect people more reliably than procedures alone.

The plan

What goes in a risk mitigation plan?

A treatment or mitigation plan turns the decision into actions that can be funded, tracked and checked. For each risk it should record:

  1. The controls chosen, and why they were chosen over the alternatives.
  2. Who is responsible for putting them in place, and who owns the risk.
  3. The actions, resources and budget required.
  4. When each action will be done.
  5. How success will be measured, including key risk indicators where they are useful.
  6. The expected residual risk, and who accepted it.

For Australian Government entities, the PSPF expects security plans to reflect the entity’s agreed tolerance to security risks, so the residual risk should be measured against that tolerance.2

Pitfalls

Common mistakes in risk mitigation

  • Buying technology before the risk has been assessed.
  • Relying on a single control, so one failure leaves nothing in place.
  • Controls that are installed but never maintained, tested or monitored.
  • No owner for the residual risk, so nobody decides whether it is acceptable.
  • Spending more on a control than the risk could ever cost, or too little on a serious risk.
How we help

How Agilient helps

Agilient turns security risk assessments into practical, costed mitigation plans that boards and executives can fund and track. Recommendations are proportionate to the risk and independent of any product, because Agilient does not sell or install security equipment. See the security risk management framework guide for how mitigation fits the wider process.

Free download

Free security threat and risk assessment template. An editable Word template that follows SA HB 167:2025 and AS ISO 31000:2018, with a threat assessment, a five by five risk matrix, a risk register and a treatment plan.

Get the free templateSee all free tools and templates

Need a mitigation plan your board will fund?

A short conversation will show which risks need treatment first, and what proportionate controls would look like.

FAQs

Risk mitigation FAQs

What is risk mitigation?
Risk mitigation is the work of reducing a risk to a level the organisation is prepared to accept, by lowering how likely it is, how serious the consequences would be, or both. In risk management standards it is part of risk treatment, which also includes avoiding, sharing and knowingly accepting risks.
What are the main risk mitigation strategies?
AS ISO 31000:2018 describes the options as avoiding the risk, taking it on to pursue an opportunity, removing the source, changing the likelihood, changing the consequences, sharing the risk, and retaining it by an informed decision. Most mitigation work falls under changing the likelihood or the consequences.
What is the difference between risk mitigation and risk treatment?
Risk treatment is the broader term for every option for dealing with a risk. Risk mitigation usually means the options that reduce a risk, rather than avoiding it, transferring it or accepting it as it is.
What should a risk mitigation plan include?
For each risk: the chosen controls and why they were chosen, who is responsible, the actions and resources needed, the timing, how success will be measured, and the expected residual risk once the controls are in place.
What is residual risk?
Residual risk is the risk that remains after controls are in place. It should be assessed and formally accepted by someone with the authority to do so, or treated further if it is still outside the organisation’s tolerance.
References

  1. Standards Australia, AS ISO 31000:2018 Risk management: Guidelines, standards.org.au
  2. Department of Home Affairs, Protective Security Policy Framework Release 2026, protectivesecurity.gov.au